Sign In | Join Free | My himfr.com
Home > Open Circuit Cooling Tower >

Package Type Industrial Counter Flow Open Loop Cooling Tower

    Buy cheap Package Type Industrial Counter Flow Open Loop Cooling Tower from wholesalers
     
    Buy cheap Package Type Industrial Counter Flow Open Loop Cooling Tower from wholesalers
    • Buy cheap Package Type Industrial Counter Flow Open Loop Cooling Tower from wholesalers

    Package Type Industrial Counter Flow Open Loop Cooling Tower

    Ask Lasest Price
    Model Number : GNZF Series
    Certification : GB7190.2-1997
    • Product Details
    • Company Profile

    Package Type Industrial Counter Flow Open Loop Cooling Tower

    Package Type Industrial Counter Flow Cooling Tower Open Loop Cooling Tower


    1. Working Principle


    This equipment is a mechanical ventilation cooling tower. Its working principle is to press the hot water to be cooled into the water sprinkling tank at the top of the cooling tower, and evenly and naturally sprinkle it on the filler through the fine holes. At the same time, the fan sucks unsaturated air from the air inlets on both sides of the tower. In the flow of the gap between the fillers, the hot water and the unsaturated air exchange heat, and the air transfers the heat to the outside and becomes hot air, which is then drawn out of the tower by the fan, thereby achieving the effect of lowering the water temperature.


    2. Product Specification


    typeinstall size mmfoundation size mm
    LLLzLL4ABCD
    axabxbex0efxg
    GNZF-50017400580014502588350350x350600x6001000x10001000x300
    GNZF-60019200640016003255400350x350700x7001000x10001000x300
    GNZF-75021600720018003055400350x350700x7001000x10001000x300
    GNZF-100025200840021003275450350x350750x7501000x10001000x300
    GNZF-1500306001020025502815500350x350850x8501000x10001000x300




    3. Common Faults and Troubleshooting


    FaultCauseTroubleshooting

    Uneven water distribution

    (Trough type water distribution)

    debris at the nozzleClear the nozzle outlet
    Nozzle falling offReinstall the nozzle
    Outlet water temperature is too highExcessive circulating waterAdjust water volume
    Insufficient air volume

    Adjust the blade installation angle,

    Check whether the packing or water collector is blocked

    The fan has abnormal vibration

    Mounting bolts looseRe-tighten
    Impeller is unbalancedCheck whether the installation angle deviation of each blade is within the specified range, recalibrate the static balance, and replace the transmission shaft.

    The gearbox makes an abnormal sound

    The reducer is leaking oil

    Gear wearChanging gears
    Bearing damageReplace bearings
    Gearbox lacks oilAdd 20#-50# industrial gear oil
    The oil seal of the new tower fails during the running-in period, and the oil pipe interface leaks oilIt is normal to run for one week. After one week of operation, the oil should be replaced with new oil. Check the oil seal to decide whether to replace it.
    The fan blades make abnormal soundsFan blade card wind tubeAdjust the fan position
    Loose fasteners and connectorsCheck tightness
    Cooling tower water leakageToo much air volumeAdjust the fan
    Water collector damagedCheck the water collection system and replace damaged parts
    Water splashing on the windshieldWater distribution overflowCheck the water distribution of the sprinkler

    Quality Package Type Industrial Counter Flow Open Loop Cooling Tower for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Wuxi Weishi Industrial Complete Equipment Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)